Engineering Design Data & CSV Templates
Download or copy synthetic sample datasets configured specifically for InfraDigital CAD's highway automation tool suite. Templates are provided as demonstration datasets and workflow resources. Users should adapt and verify them against the requirements of their specific project and governing standards. Use them to safely test calculations and validation algorithms.
ℹ️ Demonstration Datasets Notice:
All station numbers, coordinates, elevations, and volume values below are synthetic demonstration data created exclusively for educational review and software verification. They do not represent real client or governmental project records.
Available Testing Templates
Select a file below to preview, copy raw text, or download to your machine
Raw Horizontal Alignment CSV
Sample horizontal alignment coordinate data featuring PC, PT, and PI points, plus tangent station intervals. Use this to test the Horizontal Alignment Formatter.
Station,Easting,Northing,Type,Radius,Deflection 0+000.00,489000.000,1002000.000,Tangent,, 0+120.50,489110.250,1002050.800,Tangent,, 0+250.00,489220.000,1002120.000,PC,400.00, 0+380.00,489345.500,1002185.200,PI,400.00,18.45 0+510.00,489460.000,1002270.000,PT,, 0+650.00,489580.000,1002390.000,Tangent,,
Raw Vertical Profile PVI CSV
Raw vertical curve alignment profile export containing PVI elevations, parabolic curves, and grades. Perfect for testing the Vertical Alignment Formatter.
PVI Station,Elevation,Curve Length,Grade In (%),Grade Out (%) 0+000.00,1450.00,,,-1.50 0+350.00,1444.75,120.00,-1.50,2.80 0+720.00,1455.11,150.00,2.80,-0.80 1+100.00,1452.07,,,-0.80
Raw GPS Survey Coordinate Listing
A raw comma-delimited PENZD survey dataset with mismatched headers, out-of-order columns, and coordinate rows to clean using the Survey CSV Cleaner.
Point,Easting,Northing,Elevation,Description 1001,489201.382,1002381.942,1502.48,EP_L_01 1002,489204.821,1002384.821,1502.39,EP_L_02 1003,489198.110,1002379.050,1501.90,CL_01 1004,489200.540,1002381.120,1501.82,CL_02 1005,489195.400,1002376.100,1501.20,EP_R_01 1006,489197.800,1002378.200,1501.11,EP_R_02
Earthwork Takeoff Cross-Sections
Station-by-station cut and fill surface areas and net earthwork volumes. Suitable for both the Quantity Takeoff & QC tool and the Mass Haul Diagram Plotter.
Station,Cut Area (m2),Fill Area (m2),Cut Volume (m3),Fill Volume (m3),Net Volume (m3) 0+000,12.5,0.0,0.0,0.0,0.0 0+020,15.2,0.0,277.0,0.0,277.0 0+040,18.0,1.2,332.0,12.0,320.0 0+060,8.4,5.6,264.0,68.0,196.0 0+080,0.0,14.8,84.0,204.0,-120.0 0+100,0.0,22.4,0.0,372.0,-372.0
Culvert Crossing Hydrology Schedule
A sample drainage structures schedule listing hydraulic dimensions, skew configurations, and design inverts to use in the Structure Plan & Profile Generator.
Station,Structure Type,Inner Span (m),Inner Height (m),Skew Angle (deg),Invert Level (m) 0+150.00,Box Culvert (Double),3.00,2.00,15,1441.20 0+480.00,Pipe Culvert (Single),1.20,1.20,0,1447.80 0+920.00,Box Culvert (Triple),2.50,1.50,30,1451.50