Skip to main content
Back to DashboardTemplates Library
Standard Reference Templates

Engineering Design Data & CSV Templates

Download or copy sample datasets configured specifically for Infradigital's highway automation tool suite. All templates comply with standard AASHTO coordinates structures and ERA design codes. Use them to instantly test validation features.

Available Testing Templates

Select a file below to preview, copy raw text, or download to your machine

Raw Horizontal Alignment CSV

Sample horizontal alignment coordinate data featuring PC, PT, and PI points, plus tangent station intervals. Use this to test the Horizontal Alignment Formatter.

File: horizontal_alignment_raw.csvTool: Horizontal Alignment Formatter
File Content Preview:
Station,Easting,Northing,Type,Radius,Deflection
0+000.00,489000.000,1002000.000,Tangent,,
0+120.50,489110.250,1002050.800,Tangent,,
0+250.00,489220.000,1002120.000,PC,400.00,
0+380.00,489345.500,1002185.200,PI,400.00,18.45
0+510.00,489460.000,1002270.000,PT,,
0+650.00,489580.000,1002390.000,Tangent,,

Raw Vertical Profile PVI CSV

Raw vertical curve alignment profile export containing PVI elevations, parabolic curves, and grades. Perfect for testing the Vertical Alignment Formatter.

File: vertical_profile_raw.csvTool: Vertical Alignment Formatter
File Content Preview:
PVI Station,Elevation,Curve Length,Grade In (%),Grade Out (%)
0+000.00,1450.00,,,-1.50
0+350.00,1444.75,120.00,-1.50,2.80
0+720.00,1455.11,150.00,2.80,-0.80
1+100.00,1452.07,,,-0.80

Raw GPS Survey Coordinate Listing

A raw comma-delimited PENZD survey dataset with mismatched headers, out-of-order columns, and coordinate rows to clean using the Survey CSV Cleaner.

File: survey_coordinates_raw.csvTool: Survey CSV Cleaner (PENZD)
File Content Preview:
Point,Easting,Northing,Elevation,Description
1001,489201.382,1002381.942,1502.48,EP_L_01
1002,489204.821,1002384.821,1502.39,EP_L_02
1003,489198.110,1002379.050,1501.90,CL_01
1004,489200.540,1002381.120,1501.82,CL_02
1005,489195.400,1002376.100,1501.20,EP_R_01
1006,489197.800,1002378.200,1501.11,EP_R_02

Earthwork Takeoff Cross-Sections

Station-by-station cut and fill surface areas and net earthwork volumes. Suitable for both the Quantity Takeoff & QC tool and the Mass Haul Diagram Plotter.

File: earthwork_takeoff_raw.csvTool: Excel Quantity Takeoff & QC / Mass Haul Diagram
File Content Preview:
Station,Cut Area (m2),Fill Area (m2),Cut Volume (m3),Fill Volume (m3),Net Volume (m3)
0+000,12.5,0.0,0.0,0.0,0.0
0+020,15.2,0.0,277.0,0.0,277.0
0+040,18.0,1.2,332.0,12.0,320.0
0+060,8.4,5.6,264.0,68.0,196.0
0+080,0.0,14.8,84.0,204.0,-120.0
0+100,0.0,22.4,0.0,372.0,-372.0

Culvert Crossing Hydrology Schedule

A sample drainage structures schedule listing hydraulic dimensions, skew configurations, and design inverts to use in the Structure Plan & Profile Generator.

File: structure_crossings_hydrology.csvTool: Structure Plan & Profile Generator
File Content Preview:
Station,Structure Type,Inner Span (m),Inner Height (m),Skew Angle (deg),Invert Level (m)
0+150.00,Box Culvert (Double),3.00,2.00,15,1441.20
0+480.00,Pipe Culvert (Single),1.20,1.20,0,1447.80
0+920.00,Box Culvert (Triple),2.50,1.50,30,1451.50

Yonatan Abrham

Highway Design Engineer | BIM/Civil 3D Specialist | Aspiring Project Manager | Interested in AI & Technology

PhoneLinkedInFacebookInstagramTwitterYouTubeTikTok

© 2026 Highway Design Automation Suite. Built for Civil Engineers.

AdSense Disclosure: Third-party vendors, including Google, use cookies to serve ads based on user visits to this website. You may opt out of personalized advertising by visiting Google Ads Settings.